Heating Operation - Daikin RZQG71L9V1 Service Manual

Skyair gqi-eco series heat pump r-410a 50hz smart serues, classic series
Hide thumbs Also See for RZQG71L9V1:
Table of Contents

Advertisement

ESIE15-13C
2.2

Heating Operation

Function and Control
Power supply ON
Initialize electronic expansion valve
Initialize micro-computer
Preheating operation control
Remote controller ON
operation judgement
Cooling/Dry
Operation mode
Cooling/Dry
Thermostat ON judgement
Starting control
four way valve changeover
Hot start control
Normal control
· Compressor step control
· Electronic expansion valve PI control
· Low pressure protection control
· High pressure protection control
· Heating overload control
Defrosting
condition
Four way valve
changeover
Defrost
operation
Defrost
ending
judgement
Four way valve
changeover
Hot start
control
B
Emergency
judgement
Emergency
Heating
Heating
· Suction pipe superheat protection control
· Discharge pipe temperature protection control
· Inverter current protection control
· Overall current protection control
· Simulated operation
Thermostat OFF judgement
Room thermostat control
Thermostat OFF by outdoor
temperature
Pump down residual operation
Operation Flow Chart
A
operation
B
Remote
Standby
control
judgement
operation OFF
judgement
Restart standby
A
Abnormal
stop
judgement
Error code
indication
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents