IBM pSeries 670 Installation Manual page 32

Eserver
Hide thumbs Also See for pSeries 670:
Table of Contents

Advertisement

5. Route the front power cord underneath the frame and through the front floor tile hole. For more
information about floor cutouts, refer to the Site and Hardware Planning Information, order number
SA38-0508.
6. If you removed a lower panel, go to 7. If you removed a tool box, do the following:
a. Remove the two top screws from the tool box, then remove the cover.
b. Store the ship group tools inside the box and replace the cover and screws.
7. Replace the lower panel or tool box back into the frame. Use the two retaining screws previously
removed from the front of the panel to secure the panel and tool box to the rack.
8. Replace the UEPO switch on the front of the system.
To route the rear power cord, do the following:
1. Connect the plug to the Bulk Power Assembly (BPA), and ensure that the dots are aligned on the plug
and receptacle.
2. Secure the power cord in the channel with the brackets from top to bottom.
3. Remove the lower panel of the frame, and route the cord through the channel under the frame.
4. Route the rear power cord underneath the frame to the back floor tile hole. For more information about
floor cutouts, refer to the Site and Hardware Planning Information, order number SA38-0508.
5. Replace the lower panel of the frame.
16
Eserver pSeries 670 Installation Guide

Advertisement

Table of Contents
loading

Table of Contents