IBM pSeries 670 Installation Manual page 180

Eserver
Hide thumbs Also See for pSeries 670:
Table of Contents

Advertisement

6. Attention:
Two people are required to remove the BPEs.
Remove the BPEs (item 1 in the illustration on page 164).
a. Remove the five hex-head screws from the front BPE.
b. Remove the five hex-head screws from the rear BPE.
c. Install two shipping brackets (part number 11P2923) on both the front and rear of the frame using 8
M8 X 16mm bolts (part number 164803).
7. To reduce the weight so that it is the maximum two-person limit, do the following:
1 Top Panels for Front and Rear Rack Top
Frame
2 Rack Top Frame
3 Left and Right BPE Rails
164
Eserver pSeries 670 Installation Guide
1 Bulk Power Enclosure
2 Hex-Head Screw Locations
4 Foam and Metal Air Baffle
5 Rack Top-Frame Cross Brace

Advertisement

Table of Contents
loading

Table of Contents