IBM pSeries 670 Installation Manual page 136

Eserver
Hide thumbs Also See for pSeries 670:
Table of Contents

Advertisement

11. Turn the leveling foot of the plate assembly down until it contacts the bushing, and level the rack by
tightening the lock nuts on the four leveling feet.
12. Lock the leveling feet by tightening the lock nut.
13. Insert the threaded rod into the inner hole of the leveler and the rubber bushing.
14. Thread down the threaded rod until the tip of the rod is approximately 1 inch inside the turnbuckle.
15. Insert the nuts and hand-tighten the nuts.
16. Repeat the previous three steps so that all assemblies are completely installed, as shown in the
previous illustration.
17. Tighten all the nuts to 40 ft-pounds.
The frame is now secured.
120
Eserver pSeries 670 Installation Guide

Advertisement

Table of Contents
loading

Table of Contents