IBM pSeries 670 Installation Manual page 193

Eserver
Hide thumbs Also See for pSeries 670:
Table of Contents

Advertisement

PCI adapters (continued)
short adapter removal 54
power cords
installation 15
routing 15
system
connection 15
power source 13
preface xiii
prerequisites
installation 8
Processor CUoD
overview 29
processor on demand
activating process 32
activation features 29
capacity planning 30
dynamic processor sparing 31
service agent 31
software licenses 31
processor sparing, dynamic 31
product disposal 101
publications
accessing xiii
online xiii, 2
publications, related xiv
R
rack
bolting 109
covers
removing 160
replacing 174
installation 109
raised floor 118
inventory 9
leveling 10
securing 109
setup 109
top frame
removal 159
removing 159
replacement 159
replacing 159
raised floor
rack
installation 118
raised-floor environments 121
records
device 135
recycling 101
related publications xiv
relocation
system vii
removal
top frame 161
replacement
top frame 169
RIO
cabling 142
RIO (continued)
rules 142
RIO-2
cabling 142
rules 142
routing
power cords 15
running system verification 24
S
safety
electrical vii
notice 11
safety notices vii
laser compliance statement ix
saving service processor settings 155
securing
rack 109
service agent
processor on demand 31
service processor
backup settings 155
call-in
test 155
call-out
test 155
checklist 155
serial port
configuration 157
setup 155
setup checklist 155
test 155
setup and test
service processor 155
standalone diagnostics
loading 24
stopping the diagnostics 25
straps
frame ground 121
switch
EPO 12
system
configuration
minimum 7
other 8
inventory 9
power
connection 15
relocation vii
system installation 7
system records 133
key serial number 133
machine type/model 133
serial numbers 133
system records completion 26
system verification, additional 25
system verification, running 24
177
Index

Advertisement

Table of Contents
loading

Table of Contents