Non-Raised Floor Environments - IBM pSeries 670 Installation Manual

Eserver
Hide thumbs Also See for pSeries 670:
Table of Contents

Advertisement

1 Screw on Ground Clamp (for tightening the
clamp)
2 Grounding Clamp
3 Metal Floor Pedestal
4 Bottom Right Side of the Rear of the Rack
b. Position the ground strap clamp (part number 5457808) around a grounded floor pedestal.
c. Using a screwdriver, tighten the ground strap clamp screw to secure the clamp to the floor
pedestal.
d. Attach the other end of the ground strap to the ground strap clamp on the floor pedestal.
5. If no other service procedures are being performed, close the rack door.

Non-Raised Floor Environments

Determine if the frame ground straps are required (refer to the Attention in "Installing Frame Ground
Straps" on page 121) and "Signal Integrity" on page 121.
If your installation is not using a grounded-raised floor, and your servers are connected to an 9076 SP
Switch2 clustered environment, all attached server frames in your environment must be independently
grounded to the switch frame. Use the following information to help you install multiple systems to the
9076 SP Switch2 switch frame in a clustered environment:
v Order grounding straps by calling the IBM Quality Hotline at 1-800-IBM-LINE and requesting Part
Number 44P3695, Grounding Kit. Each kit contains one ground strap and the required hardware to
make a single connection between a server and a 9076 SP Switch2, so order one kit for each server
that is connected to the switch.
v An IBM service representative will install the grounding straps by using instructions that are provided
with the grounding kits. Each server frame must be directly connected to a 9076 SP Switch2 frame.
5
6
7
8
1
Right Rear of Rack
4
3
2
5 Starwasher (install if supplied)
6 Lug on Ground Strap
7 Screw (for attaching lug to the rack)
8 Ground Strap
Appendix D. Securing the Rack
123

Advertisement

Table of Contents
loading

Table of Contents