12.3 Notes on maintenance
The IBC TopFix 200 mounting system is largely maintenance-free thanks to the materials used.
In addition to the electrical inspections prescribed for the entire PV system, we recommend inspections of
the PV generator every two years, considering the following points.
Check:
Solar modules for damage and dirt
All mechanical connections are firmly secured (re-tightening screw connections)
Mounting system and module frame for mechanical damage caused by snow and ice loads
Integrity of the outer roofing
All electrical cables for damage (e.g. by animals)
All electrical plug and screw connections are secure and protected against accidental contact
If it becomes necessary to clean the modules, this must be done without chemical cleaning products and
using clear water only.
The modules can easily be replaced by removing the module cabling and undoing the corresponding
module clamps. In this process, please observe the relevant safety requirements.