IBC TopFix 200 Installation Manual page 46

Table of Contents

Advertisement

Step 4: Affixing the "Eco trapezoidal system"
Figure 76: Removing the protective foil
Step 5: Distributing the "Eco trapezoidal system" as specified
Figure 78: "Eco trapezoidal system" distributed as specified
Step 6A: Affix "Eco trapezoidal system" to the outer roofing with blind rivets
Important:
A drill with a diameter of 5.0 mm
is mandatory to maintain static properties!
Figure 79: Drilling clamps
46
Version 17.01, as of: 27-Jun-2017
Figure 77: Affixing the "Eco trapezoidal system"
When using the riverts drill two bores with a diameter of 5.0 mm per
"clamp base". In this process, make sure you drill carefully to maintain
static properties.
Now insert the 4.8x15mm sheet blind rivets into the bores and rivet.
The enclosed 4.8x15 mm sheet blind rivets are approved for a sheet
metal or aluminium thickness of between 0.5 mm and 1.5 mm.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents