IBC TopFix 200 Installation Manual page 39

Table of Contents

Advertisement

* The listed tools and auxiliary agents are required exclusively for installation and processing of the
trapezoidal sheet metal panels.
Information about tools for module and carrier rail mounting is provided in section 1 in these installation
instructions.
4.9.3 Dimensioning
The mounting system is dimensioned in our very own PV Manager software, taking into account local
conditions.
Important:
Do no exceed a maximum carrier profile length of 3 beams (approximately 15.60 m) for continuous carrier
rails due to thermal expansion.
4.9.4 Mounting trapezoidal sheet metal panels
Step 1: Dimensioning using "PV Manager"
Step 2: Mark the fixing points of the clamp
Figure 56: Marking fixing points
Step 3: Clean the roofing
Exclusively clean the roofing in areas where you intend to affix trapezoidal clamps at a later point. The
surfaces must be dry and free from grease, oil or silicone as well as dirt particles to safeguard optimum
integrity. In the event of heavy-duty contamination, we recommend to carefully roughen up the surface with
suitable materials (e.g. fleece cleaning cloth) to subsequently clean it. We recommend using isopropyl
alcohol or acetone in combination with lint-free paper towels for cleaning.
Important: Please observe the safety regulations when handling solvents and chemicals.
39
Version 17.01, as of: 27-Jun-2017

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents