WACKER Group LTC 4 Repair Manual page 33

Light tower
Table of Contents

Advertisement

LTC 4L
3.7.4
WARNING
3.7.5
3.7.6
wc_tx000543gb.fm
Pull and hold the mast locking pin (p). Rotate the handle on the tongue-
mounted winch (o) counterclockwise ("cable out" direction) until the
mast spring begins to pivot the mast down. Release the mast locking
pin and continue to rotate the handle until the mast is resting in the
transport cradle. Be sure that the secondary locking pin (t) penetrates
all sections of the mast.
NEVER pull the vertical mast locking pin (e) while the tower is
raised! Releasing the locking pin while the tower is raised may cause
the tower to fall or the machine to tip over.
After the mast is down, secure it in the cradle by inserting the cradle
lock pin (j). Insert the clip through the pin to secure it in place.
Position the light fixtures to aim at the ground.
CAUTION: Allow the floodlights to cool 10–15 minutes before moving
trailer. Moving the trailer while the lights are still hot could cause the
bulbs to break.
29
Operation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents