Daikin F-Series Service Manual page 268

Inverter multi for 2 rooms
Hide thumbs Also See for F-Series:
Table of Contents

Advertisement

SiBE12-712C
Step
3
Loosen the 4 screws
and remove the
discharge grille.
Loosen the 2 screws of
4
the stop valve cover
and remove it.
Removal Procedure
Procedure
Points
When reassembling, make
sure to fit the 4 hooks.
(R7700)
The stop valve cover is
united with the shelter.
Stop
valve
cover
(R7699)
When assembling the stop
valve cover, make sure to fit
the 4 hooks.
(R7701)
Outdoor Unit
257

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents