Integration Into A Control System; Preparing The Switch - Hirschmann MACH 100 User Manual

Industrial ethernet (gigabit-)switch
Hide thumbs Also See for MACH 100:
Table of Contents

Advertisement

IEC 61850/MMS
(RSR20/RSR30/MACH1000)
4.2 Integration into a Control
System
4.2.1

Preparing the Switch

After installing and connecting the Switch, you configure it according to the
"Basic Configuration" user manual:
 Check that an IP address is assigned to the device.
 To start the MMS server, activate the function in the graphical user
interface, in the Advanced:Industry Protocols:IEC61850 dialog.
Afterwards, an MMS client is able to connect to the device and to read and
monitor the objects defined in the bridge model.
64

4.2 Integration into a Control System

UM IndustProtocol
Release 9.0 02/2015

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents