Honeywell HC900 User And Installation Manual page 249

Process and safety controller
Hide thumbs Also See for HC900:
Table of Contents

Advertisement

16 Point AC Digital Input
Step
4
Connect field wiring.
Note: S-L1 in the wiring figure below refers to power that is disconnected from these screw terminals when
switch SW1 is open (0).
L2
L1
16 Point DC Digital Output
Step
1
ATTENTION: RTP and cables are intended for permanent installation within their own enclosure.
ATTENTION: 16 point DC Digital Output is rated at 8A per module and 1A per output. Limited to 4A
per group of 8.
ATTENTION: The RTP combines the two groups of 8 outputs into one group of 16.
Mount RTP cable assembly to HC900 Controller (Figure 96).
Remove appropriate key tabs from terminal board to allow mating with the module. See page 85.
Connect desired cable to 16 point DC DO module at controller. Choose from:
900RTC-L010
900RTC-L025
900RTC-L050
Install 16 point DC DO label into the module connector cover.
Connect shield drain wire to the grounding bars at the base of the HC900 rack. All field-wiring
shields must be grounded as described in the shield grounding section (page 81).
Revision 6
21 April 2017
1
2
3
4
5
6
7
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Remote Terminal Low Voltage Cable Assembly, 1.0 meters long
Remote Terminal Low Voltage Cable Assembly, 2.5 meters long
Remote Terminal Low Voltage Cable Assembly, 5.0 meters long
HC900 Process & Safety Controller User and Installation Manual
Action
8
9 10 11 12 13 14 15 16 17 18 19 20
Install jumper wires
Action
235

Advertisement

Table of Contents
loading

Table of Contents