Chapter 2 Installation In A Rack; Preparing For Setup; Choosing A Setup Location - Supero SUPERSERVER 1018GR-T User Manual

Table of Contents

Advertisement

This chapter provides instructions for mounting your chassis in a rack.
2-1

Preparing for Setup

The box in which your system was shipped should include two sets of rail
assemblies, two rail mounting brackets and the mounting screws to mount the
system into the rack. Please read this chapter in its entirety before beginning the
installation procedure.

Choosing a Setup Location

Decide on a suitable location for the rack unit that will hold your system. It should
be a clean, dust-free area that is well ventilated. Avoid areas where heat, electrical
noise and electromagnetic fields are generated. A nearby grounded power outlet.
is required
Leave at least 25 inches clearance in front of the rack to open the front door
completely.
Leave approximately 30 inches of clearance in the back of the rack to allow for
sufficient airflow and access for servicing.
It should be a restricted access location, such as a dedicated equipment room
or a service closet.
Chapter 2
Installation in a Rack
2-1
Chapter 2: Installation in a Rack

Advertisement

Table of Contents
loading

This manual is also suitable for:

Superserver 5018gr-t

Table of Contents