Cause Of Last Trip; Cause Of Last Event - GE 269Plus Instruction Manual

Motor management relay
Table of Contents

Advertisement

ACTUAL VALUES MODE
Table 3–2: 269Plus ACTUAL VALUES (Sheet 6 of 9)
PAGE
LINE INFORMATION LINE
5
2
XXXXXXXXXXX
5
3

CAUSE OF LAST EVENT:

3
5
4

CAUSE OF LAST TRIP:

5
5
PRE-TRIP AVERAGE MOTOR
CURRENT = XXXXX AMPS
5
6
PRE-TRIP PHASE CURRENT
I1 = XXX AMPS
5
7
PRE-TRIP PHASE CURRENT
I2 = XXX AMPS
5
8
PRE-TRIP PHASE CURRENT
I3 = XXX AMPS
5
9
PRE-TRIP U/B RATIO
(In/Ip) XXX PERCENT
5
10
PRE-TRIP G/F CURRENT
G/F =
5
11
PRE-TRIP MAX STATOR RTD
5
12 †
PRE-TRIP AVERAGE VOLTAGE
VOLTS = XXXXX
5
13 †
PRE-TRIP KWATTS
KW = +XXXXX
5
14 †
PRE-TRIP KVARS
KVAR = +XXXXX
† Available only if a meter is online.
‡ Messages not shown if the answer to
3-
12
Courtesy of NationalSwitchgear.com
XXXXXXXXXXXX
XXXXXXXXXXXX
XXX AMPS
RTD#
X =
XXX C
A R E T H E R E A N Y R T D S C O N N E C T E D ?
269Plus Motor Management Relay
DESCRIPTION
This message is only displayed (and defaulted to)
when a trip or alarm occurs and describes the trip/
alarm condition. Refer to Table 3–4: TRIP/ALARM
MESSAGES AND FAULT DIAGNOSIS on page 3–
44. See also Section 3.4a: STARTS/HOUR TIMER
on page 3–15.
Describes the cause of the last detected event (see
Section 3.4a: STARTS/HOUR TIMER). Updated
when an event occurs (trip or inhibit).
Describes the cause of the last trip. It is updated
when a trip occurs. See Section 3.4a: STARTS/
HOUR TIMER on page 3–15.
Average motor phase current prior to last relay trip.
I1 motor phase current prior to last relay trip.
I2 motor phase current prior to last relay trip.
I3 motor phase current prior to last relay trip.
Ratio of negative to positive sequence currents prior
to last relay trip.
Ground fault current prior to last relay trip.
(= will be > if delay is set to 0.0, 0.25, or 0.5)
Maximum stator RTD temperature prior to last relay
trip. Message displayed only if the answer to
T H E R E A N Y R T D s C O N N E C T E D ?
on Setpoints page 2, line 3).
Average voltage prior to last relay trip
KW prior to last relay trip (see Figure 3–8: POWER
MEASUREMENT CONVENTIONS on page 3–67).
Kvars prior to last relay trip (see Figure 3–8: POWER
MEASUREMENT CONVENTIONS on page 3–67).
is
(located on Setpoints page 2, line 3).
N O
3 SETUP AND USE
A R E
is
(setpoint located
Y E S
GE Power Management

Advertisement

Table of Contents
loading

Table of Contents