3-7-2 Setting an Annual Schedule
Click the menu item [Schedule Settings] and click [Annual] in the sub menu to display the Annual Schedule
setting screen. You can use the annual schedule to set schedules for days such as public holidays and
summer vacation that need to be scheduled differently to the weekly schedule. For each air conditioner group,
it is possible to set 50 day-long settings up to 24 months into the future (including the current month).
When saving the settings, settings for days that have passed will be deleted automatically.
To set an annual schedule, first select the range and object of the schedule setting and then set the contents
of the schedule for each schedule pattern. After setting the contents of the schedule pattern (Pattern 1 – 5),
allocate the schedule pattern you wish to use for the days such as public holidays or summer vacation you are
setting the annual schedule for.
Note: Settings for the groups whose schedules have been Not Available from the control screen are settable, but their annual
schedules will not be executed.
Note: When the contents of an operation are executed as part of a schedule these contents will continue to be in effect until they
are changed by a schedule or browser etc. Therefore, if you are setting a schedule that is only for a particular day, be sure
to set your schedule in a way that will not impact on the next day's operation.
For example, if you wish to prohibit operations being performed from the remote controller after 17:00, set a Prohibit
operation for 17:00 and set an Enable operation for 23:59.
Setting Range
Select the range that
scheduling will be set for.
Block Name
Select the block to be set.
Group Name
Select the group to be set.
Copy (Group) / Paste
Click to copy or paste a
schedule between groups.
Group Number
Select the group to be set.
Expansion Controller
system selection
buttons
Click to display the desired
system.
Undo button
Click to undo the changed.
3-7-2-1 Setting an Annual Schedule for air conditioner and various groups
Text below explains how to set the annual schedule for the groups of air conditioners, Ventilators (LOSSNAY),
Air-To-Water (PWFY) units, and general equipment.
(1)Select the target for the schedule being set
Follow the procedure outlined for the weekly schedule (see 3-7-1) to select the range and object of the
schedule setting.
(2)Select the schedule pattern you want to set
In the Contents of Annual Schedule box situated at the upper right
part of the screen, choose the pattern you wish to set from Pattern 1 -
5. (If you do not need to modify any of the existing schedule pattern
settings, then skip steps (2) and (3).)
35
Select the schedule
pattern
Select which pattern you wish
to set the schedule for.
Contents of Schedule
Operations set for the
schedule are displayed here.
Copy (Pattern) / Paste
Click to copy or paste a
schedule between each
pattern.
Edit button
Click to set a schedule
operation.
Delete button
Click to delete a schedule
operation.
Calendar
Use the calendar to specify
the days that the selected
schedule pattern will be
allocated for.
Save Settings button
Click to save the contents of
the schedule setting. The
schedule settings will not be
saved unless this button is
pressed.