Fujitsu AOU48RLXFZ Design & Technical Manual page 278

Hybrid flex inverter system
Table of Contents

Advertisement

Duct installation
Please fasten the connecting parts of the ducts with band, and wrap with vinyl tape to ensure
no air leaks. [Carry out the work to ensure no air leakage at a pressure of 200 Pa (0.80in.
WG)]
Please do not construct the duct in the manner of below.
○Extreme Bends
○Highly Repetitive Bends
○Making the Connecting Duct Diameters Smaller
Completion figure
Indoor unit
Fresh air intake kit
When wiring of the duct fan is required please refer to "■FRESH AIR CONTROL OUTPUT".
Band (field supplied)
Vinyl tape (field supplied)
Duct (field supplied)
Hanging band for duct
(field supplied)
- (06 - 124) -
6. SYSTEM DESIGN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents