Fujitsu AOU48RLXFZ Design & Technical Manual page 245

Hybrid flex inverter system
Table of Contents

Advertisement

EXTERNAL INPUT PRIORITY MODE
It is possible to switch to cooling operation or heating operation by using external input.
Circuit diagram example
Outdoor unit
control PC board
Connector
1
2
* Make the distance from the PC board to the connected unit within 33ft. (10m).
Use the following parts and construct a circuit as shown above.
Input Signal···OFF : Cooling operation, Input Signal···ON : Heating operation
*Set the "External input priority mode", refer to "5.FUNCTION SETTING".
ON
Input Signal
OFF
Heating
Priority mode
Cooling
Parts (Optional)
Parts name
Model name
Connected unit
Ex.) Switch
Contact capacity : 24VDC or more, 10mA or more.
*33ft. (10m)
Signal
Field supply
External connect kit
UTY-XWZXZ3
- (06 - 91) -
6. SYSTEM DESIGN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents