WaterLogic CUBE FIREWALL Manual page 58

Table of Contents

Advertisement

13. The CUBE Water Treatment System will now begin to heat / chill the water. The hot water should
be up to operating temperature after 8 to 10 minutes and the old water will take between 60 to 90
minutes to chill.
14. Taste test the water, if there is any hint of taste in the water, flush and additional 1 ½ gallons of hot
water, then 1 ½ gallons of cold water. Do another taste test and if necessary repeat the flush again.
15. Verify that the UV Lamp operates as expected (no UV Lamp alarm will sound on the display).
WARNING!
ULTRAVIOLET RADIATION. Protect your skin and eyes against ultraviolet rays.
Never look directly at an operating UV light. Always disconnect before removal.
16. Move the Waterlogic CUBE Water Treatment System into its final operating position. Be sure that a
minimum of 2" clearance is maintained around both the sides and the back of the unit. This is
important to allow proper airflow and heat exchange of refrigeration system.
17. When the unit has reached its Hot Temp Set Point, the heater will cycle off. When the unit has
reached its Cold Temp Set Point Temperature, the compressor will cycle off.
18. Once the unit is at the target temperature(s), sample the water to ensure water meets expectations
and additional rinsing or adjustment is not required.
19. Check the unit for any leaks. External Leak Protection is always recommended.
CUBE Manual
Page 58 - Revision: 5-24-2017

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents