WaterLogic CUBE FIREWALL Manual page 53

Table of Contents

Advertisement

ENABLING HOT TANK
During Initial Installation or anytime the unit loses power, you must follow the Hot Tank Enabling
Procedure.
CAUTION!
NEVER TURN ON HEATER BEFORE FILLING HOT TANK. Green
Heater and Compressor Power Switch must be in the O=OFF position while
the hot tank is empty. Damage could occur within one minute and the
overload (high limit) will require manual reset if heater is turned on with an
empty Hot Tank.
26. Connect Cube Water Treatment System to power.
27. Turn the Red Power Switch on back of CUBE Water Treatment System. I=ON
28. Ensure green heater / compression switch is in the O=OFF.
CAUTION!
NEVER TURN ON HEATER BEFORE FILLING HOT TANK. Green Heater and
Compressor Power Switch must be in the O=OFF position while the hot tank is empty. Damage
could occur within one minute and the overload (high limit) will require manual reset if heater is
turned on with an empty Hot Tank.
29. Press the Hot Select Icon for 2 seconds until it illuminates.
30. Press the Dispense Button continuously for a minimum of 10 seconds. The dispense backlight will
turn Red Indicating Hot Water.
31. Continue to dispense until water comes out the faucet to ensure the Hot Tank is full before turning
on the heater circuit.
32. Turn on the Green Heater/Compressor switch. I = ON. This ensures the Hot
Water is full of water before the Heat Circuit will enable.
CUBE Manual
Page 53 - Revision: 5-24-2017

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents