Mechanical Mounting; Pedestal Installation Of D-Frames - Danfoss VLT HVAC Drive FC 102 Design Manual

110-1400 kw
Hide thumbs Also See for VLT HVAC Drive FC 102:
Table of Contents

Advertisement

How to Install

5.1.3 Mechanical Mounting

1.
Drill holes in accordance with the measurements given.
2.
Provide screws suitable for the mounting surface. Retighten all 4 screws.
The frequency converter allows side-by-side installation. The back wall must always be solid.
5
5
Table 5.5 Required Free Air Space Above and Below Frequency Converter
NOTICE
If using a kit to direct the heatsink cooling air out the back of the frequency converter, the required top clearance is
100 mm.

5.1.4 Pedestal Installation of D-frames

The D7h and D8h frequency converters are shipped with a
pedestal and a wall spacer. Before securing the enclosure
to the wall, install the pedestal behind the mounting
flange as shown in Illustration 5.27.
Illustration 5.27 Wall Mounting Spacer
To install a pedestal-mounted D-frame unit, perform the
following steps as shown in Illustration 5.28:
1.
Attach the pedestal to the back channel using 2
M10 nuts.
2.
Fasten 2 M5 screws through the back pedestal
flange into the pedestal drive mounting bracket.
3.
Fasten 4 M5 screws through the front pedestal
flange into the front gland plate mounting holes.
98
Enclosure
D1h/D2h/D3h/D4h/D5h/D6h/D7h/D8h
E1/E2
F1/F2/F3/F4
F8/F9/F10/F11/F12/F13
Danfoss A/S © Rev. 05/2014 All rights reserved.
Design Guide
1
Illustration 5.28 Pedestal Hardware Installation
Air space [mm]
225
225
225
225
3
2
MG16C202

Advertisement

Table of Contents
loading

Table of Contents