Figure 96. Installing the LCD control panel—four 3.5-inch hot swappable hard drive chassis
1.
LCD control panel
3.
display module cable retention clip
5.
tabs on the LCD control panel (6)
Figure 97. Installing the LCD control panel board—four hard drive chassis
1.
screw (2)
3.
display module cable
5.
USB connector cable
Next steps
Follow the procedure listed in the After working inside your system section.
134
2.
notches (6)
4.
display module cable
2.
control panel connector cable
4.
LCD control panel board
6.
standoff on the chassis (2)