Carrier AquaEdge 19XRV series Operation, Maintenance And Installation Manual page 191

Single-stage or two-stage semi-hermetic centrifugal liquid chillers with pic iii controls and hfc-134a 50/60 hz
Table of Contents

Advertisement

START MACHINE AND OPERATE. COMPLETE THE FOLLOWING:
A: Trim charge and record under Charge Refrigerant Into Chiller section on page 79.
B: Take at least two sets of operational log readings and record.
C: After machine has been successfully run and set up, shut down and mark shutdown oil and refrigerant levels.
D: Give operating instructions to owner's operating personnel. Hours Given:
E: Call your Carrier factory representative to report chiller start-up.
F: Register LiquiFlo2 VFD start-up at www.automation.rockwell.com/complete1/warp.
G: Return a copy of this checklist to the local Carrier Service office.
SIGNATURES:
CARRIER
TECHNICIAN
DATE
CUSTOMER
REPRESENTATIVE
DATE
CL-3
Hours

Advertisement

Table of Contents
loading

Table of Contents