FOR 19XRV SEMI-HERMETIC CENTRIFUGAL LIQUID CHILLER
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere
to the safety considerations/information as outlined in preceding
sections of this Start-Up, Operation, and Maintenance Instruc-
tions document.
MACHINE INFORMATION:
NAME
ADDRESS
CITY
DESIGN CONDITIONS:
TONS
BRINE
(kW)
COOLER
CONDENSER
CHILLER LINE SIDE:
OIL PUMP:
REFRIGERANT: Type:
CARRIER OBLIGATIONS:
START-UP TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP INSTRUCTIONS
JOB DATA REQUIRED:
1. Machine Installation Instructions Yes No
2. Machine Assembly, Wiring and Piping DiagramsYes No
3. Starting Equipment Details and Wiring DiagramsYes No
4. Applicable Design Data (see above)
5. Diagrams and Instructions for Special ControlsYes
INITIAL MACHINE PRESSURE:
Was Machine Tight?
If Not, Were Leaks Corrected?
Was Machine Dehydrated After Repairs?
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53190044-01
INITIAL START-UP CHECKLIST
(Remove and use for job file.)
STATE
FLOW
TEMPERATURE
RATE
IN
Volts
FLA
Volts
RLA
Charge
Assemble... . . . . . . . . . . . . . . . .
Leak Test . . . . . . . . . . . . . . . . . . .
Dehydrate . . . . . . . . . . . . . . . . . .
Charging . . . . . . . . . . . . . . . . . . .
Operating Instructions
Yes
YES
Printed in U.S.A.
JOB NO.
MODEL
ZIP
TEMPERATURE
PRESSURE
OUT
DROP
OLTA
OLTA
Yes
No
Yes
No
Yes
No
Yes
No
Hrs.
No
No
NO
Form 19XRV-CLT-7SS
Pg CL-1
S/N
SUCTION
CONDENSER
PASS
TEMPERATURE
TEMPERATURE
******
12-16
Replaces: 19XRV-CLT-6SS
******