Mira Mode Instructions Manual page 22

Table of Contents

Advertisement

Finished wall
surface
Building-in
Shroud
Finished wall
surface
23 mm
Maximum
Depth
Support
Bracket
6 mm Minimum Depth
Support
Bracket
58 mm
6.
Remove the plaster and brick/block
for the shower control to a depth of
between 76 and 93 mm from the
finished surface of the wall. The
support bracket requires a clearance
depth of 70 mm, with a finished wall
surface thickness of between 6 and
23 mm.
7.
Remove the plaster and brick/block
for the supply and outlet pipes.
8.
If necessary, remove the shower
control from the support bracket. This
will make installation easier.
9.
Mark the support bracket fixing hole
positions. The support bracket must
be fixed at 45°.
10. Drill a 6.0 mm diameter hole at each
of the marked positions and insert the
wall plugs (supplied).
11. Install the hot and cold supply pipes.
12. Thoroughly flush the hot and cold
water supply pipes. The supplies
must be clean and free from debris
before connecting the shower
control. Failure to do so may result
in product malfunction.
22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents