Attaching The Power Cord; Powering Up The Switch; Cabling - Acopia ARX 1000 Hardware Installation Manual

Adaptive resourse switch
Table of Contents

Advertisement

Attaching the Power Cord

Powering Up the Switch

Cabling

ARX®1000 Hardware Installation Guide
Locate the power ON/OFF toggle switch on the back of the switch and
ensure it is set to the OFF position.
DANGER
In the event that AC power must be removed from the system, disconnect the
power cord before servicing the unit to avoid electric shock.
Figure 5.3 ON/OFF Power Switch (Rear View)
See Power Cord and Cable Requirements, on page 4-5 for power cord and
cable specifications.
WARNING
Before applying power, ensure that the AC outlet to the switch is properly
grounded.
To power up the switch, turn the ON/OFF toggle switch(es) to the ON
position.
You can cable the client/server ports before or after the switch is connected
to the network.
Ethernet cables are supplied by the customer. For cable specifications and
requirements, see Power Cord and Cable Requirements, on page 4-5. For
cable connector and pinout information, see Cable Connectors and Pinouts,
on page 4-6.
Attaching the Power Cord
5 - 7

Advertisement

Table of Contents
loading

Table of Contents