Verifying Shipment; Unpacking The Switch - Acopia ARX 1000 Hardware Installation Manual

Adaptive resourse switch
Table of Contents

Advertisement

Chapter 5

Verifying Shipment

Unpacking the Switch

5 - 4
The ARX®1000 shipment includes the 2U ARX®1000 itself and an
Accessory Kit. The Accessory Kit is packed on top of the switch. Check the
contents of the shipping crate to verify complete shipment:
• 1 15-Amp AC power cord with 8-ft. (2.4384-Meter) cable
• 1 250V locking power cord (an alternative to the above)
• 1 8-ft. (2.4384-M) crossover cable (for the Console) with RJ-45-to-DB9
adapter
• 2 mounting rails, 1 left and 1 right
• 2 sets of screws for mounting the rails to the rack: 12 #8 screws and 12
#10 screws
• 2 sets of Tinnerman nut retainers (12 nuts per set); each set fits a
different type of rack rail
• ARX®1000 Quick Installation Card
• ARX®1000 Hardware Installation Guide (this manual)
The ARX®1000 switch is shipped in a single box with all components
installed. The switch weighs approximately 35 lb. (without packaging).
Unpack the switch as follows:
1. First inspect the box for any shipping damage.
2. Open the box (top flaps) and remove the Accessory Kit.
3. Check the 'shock watch' sticker on the inside of the packaging. If it
is red, the equipment may be damaged from some physical shock
(such as a drop).
4. Verify the contents of the Accessory Kit (contents listed above).
5. Carefully lift the switch and separate rack-mount rails out of the
box.

Advertisement

Table of Contents
loading

Table of Contents