Using the Program
54
Item
Control
Configuration
Area
Configure Peak Controls.
Operation Status
- Can be configured in [Environment > Advance Setting].
- Priority: Controls based on group priority
- Outdoor unit capacity control: Controls based on outdoor unit
capacity limit.
(Operation Status - Priority Control selected)
Operation
- [Run] Button: Operates the device.
- [Stop] Button: Stops the operation of the device.
ShiftTime(Min.): The cycle by which the operation switches over.
Target ratio(%): Displays the target operation rate.
Current Running(%): Displays the current rate.
(Operation Status - Outdoor unit capacity control selected)
Operation
- [Run] Button: Operates the device.
- [Stop] Button: Stops the operation of the device.
Target ratio(%): Displays the target operation rate.
Description