Chapter 3. Operation; Introduction - GE DigitalFlow XMT868i Startup Manual

Ultrasonic flow transmitter for liquids
Table of Contents

Advertisement

Chapter 3.
Operation

3.1 Introduction

See Chapter 1, Installation, and Chapter 2, Initial Setup, to prepare the Model XMT868i system for operation. When
the meter is ready to take measurements, proceed with this chapter. The following specific topics are discussed:
Powering Up
Using the Display
Taking Measurements
Pausing Measurement
Note: All inputs and outputs of the Model XMT868i are calibrated at the factory, prior to shipment. If it becomes
necessary to recalibrate any of the inputs and/or outputs, see Chapter 1, Calibration, of the Service Manual for
instructions.
WARNING!
as described in this manual. In addition, be sure to follow all applicable local safety codes and
regulations for the installation of electrical equipment.
DigitalFlow™ XMT868i Startup Guide
To ensure the safe operation of the Model XMT868i, it must be installed and operated

Chapter 3. Operation

47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents