Victory Motorcycles OCTANE 2017 Rider's Manual page 83

Table of Contents

Advertisement

Fairing Removal/Installation
1. Remove the turn signal mounting fasteners on both sides of the motorcycle.
2. Rotate the signals forward toward the front tire.
3. Remove the two M8 fairing bracket fasteners.
4. Carefully slide the fairing straight forward to clear the headlight.
5. When reinstalling the fairing, make sure the fairing is centered about the headlight
before tightening the bracket fastener.
Torque: 15 ft-lbs (20 Nm)
6. Realign each turn signal to the forward-facing position by aligning the locating tab on
the turn signal mount with the gap in the lower triple clamp. Tighten the mounting
fasteners.
Torque: 36 in-lbs (4.1 Nm)
Mounting Fasteners
36 in-lbs (4.1 Nm)
Maintenance
Bracket Fasteners
15 ft-lbs (20 Nm)
81

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents