the cables through their respective cable entrances and connect them to WAGO con-
nectors.
(inside the
shield cover)
TB101 TB102
IV-3.5 sq.
Cable clamps, entrances
TB3
1 5
1 4
TB1
1 3
1 2
1 1
1 1
1 0
1 0
9
9
TB2
8
8
7
7
6
6
6
5
5
5
4
4
4
3
3
3
2
2
2
1
1
1
TB8
TB9
1 4
1 3
TB7
1 2
1 2
TB6
1 1
1 1
1 0
1 0
1 0
9
9
9
9
8
8
8
8
7
7
7
7
6
6
6
6
5
5
5
5
4
4
4
4
3
3
3
3
2
2
2
2
1
1
1
1
Top cover
TB5
TB4
7
6
5
5
4
4
3
3
2
2
1
1
TB10
1 3
1 2
1 1
TB11
1 0
9
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
Cable clamps
(two sets)
Earth plates (two sets):
Fix each shield of cables
here.
2. WIRING