Siemens SINAMICS G120 Manual page 11

Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

3
The Basic Operator Panel (BOP-2)
and the Intelligent Operator Panel
(IOP) are used to operate and
monitor the inverter.
+
The optional PC Connection Kit-2
can also be used to operate and
monitor the inverter.
The kit is required in order to
establish communication between
the PC and the Control Unit.
Each Control Unit can be
freely combined with each
IP20 Power Module.
Note

Advertisement

Table of Contents
loading

Table of Contents