Close power after the completion of the Program upgrade, downward the
two dial switches next to the LAN port, dial back to its original position, as
shown in figure: the state of switch downward:
Restart the equipment power, reset through the front panel operation after
the completion of restart, upgrade process finish.
VSP 3500
User Manual
112