Chapter 3 Transporting and Installation

Proper procedure must be followed when using this system.
Exercise caution to assure personnel safety during the installation, operation,
maintenance, and inspection of the system.
Only personnel, who have adequate knowledge and experiences with not only
this system but associated equipment are allowed to perform transport,
installation, and maintenance involving potential hazardous task.

3.1 Transporting

For transporting with the forklift, be sure to insert the fork into a
designated position, referring to "3.1.1 Transporting with forklift" on
page 3-2.
Do not set this system on its side during transportation. Oil in the
compressor drains into the refrigerant pipe, which causes lubricant
shortages leading to damage to the compressor.
Drain the remaining fluid out of the pipe as much as possible.
The remaining fluid may spill if disregarded.
Exercise caution not to damage the panel and piping with the forklift
when transporting the system.
HRZ Series
This system is heavy, which poses potential danger at transportation.
When transporting this system, the following safety precautions should be
observed to prevent system damage and breakdown.
Chapter 3 Transporting and Installation
HRX-OM-I051
3.1 Transporting
3-1