SMC Networks HRZ001-L Operation Manual page 39

Thermo-chiller
Table of Contents

Advertisement

 Procedure for piping installation
 Recommended piping installation
Circulating fluid supply
Circulating fluid return
Facility water outlet
Facility water inlet
No.
1
2
Y-strainer (100m)
3
4
Y-strainer (5m)
HRZ Series
Secure the pipe coupling section with a pipe wrench, and provide proper tightening
to the pipe.
Figure 3-12
Figure 3-13 Recommended Piping Installation
Table 3-4 Recommended Pipe
Name
Valve
Valve
Chapter 3 Transporting and Installation
Pipe coupling section
Pipe Tightening
Size
Rc3/4
Stainless steel
Stainless steel
Rc3/4
Rc1/2
Stainless steel
Stainless steel
Rc1/2
HRX-OM-I051
System on the
customer side
Material
3.3 Procedure for Installation
3-15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents