GE Multilin W650 Instruction Manual page 595

Wind generator protection system instruction manual gek-113032a
Table of Contents

Advertisement

APPENDIX D
Table D–1: OPERATIONS:
Table D–2: CLOCK SYNCHRONIZATION:
The date in the answer is the same as the received in the command.
The relay date is synchronized after performing this command.
Table D–3: RESET OF PROCESS
QRP_RESET_GRAL: General reset of process.
Table D–4: ACQUISITION OF TRANSMISSION DELAY:
The date in the answer is the same as the received in the command.
GEK-113032A
OPERATIONS
POINT
DESCRIPTION
C_SC_NA_1
3000 – 3011
Command OFF
3000 – 3011
Command ON
CLOCK SYNCHRONIZATION
POINT
DESCRIPTION
C_SC_NA_1
0
Set Date
RESET OF PROCESS
POINT
DESCRIPTION
C_RP_NA_1
0
Reset of Process
DELAY ADQUISITION
POINT
DESCRIPTION
C_CS_NA_1
0
Delay Acquisition
W650 Wind Generator Protection System
D.5 IEC 60870-5-104 POINT LIST
D
D-7