Installation; Operating Instructions - Roundup HCT-2010 Owner's Manual

Horizontal contact toaster
Table of Contents

Advertisement

Silicone
Belt
Release
Sheet
Bracket
Figure 1. Installing Release Sheet
Crown Side
ONLY
Bun Thickness
Adjustment Control
Heel Side
ONLY
Figure 2. HCT-2010 Toaster
Figure 3. Crown Setting
Figure 4. Heel Setting
P/N 1011139 Rev. G 11/15

INSTALLATION

1. Remove unit and all packing materials
from shipping carton.
2. The unit should come with the items
Release
listed below:
Sheet
• Bun Chute
• Butter Wheel Assy. (including Roller,
Butter Pan, and Heated Base)
• Three Release Sheets
• Owner's Manual and Authorized
Service Agency Directory
NOTE: If any parts are missing or dam-
aged, contact Antunes Technical Service
IMMEDIATELY at 1-877-392-7854 or
1-630-784-1000.
3. Remove all packing materials and
protective coverings from the unit.
Butter Wheel
Power Receptacle
4. Wipe all surfaces of the unit with a
hot damp cloth.
Control Panel/
Power Switch
NOTE: Do NOT use a dripping wet cloth.
Butter Wheel
Wring out before use.
Assembly
When placing the toaster into service, pay
attention to the following guidelines.
• Make sure the power switch is off and
the unit is at room temperature before
plugging in the power cord.
• Do not block or cover any openings
on the unit.
• Do not immerse the power cord or
plug in water.
• Keep the power cord away from
heated surfaces.
• Do not allow the power cord to hang
over edge of table or counter.
• Provide 1" clearance on the sides and
rear of the unit to prevent any dam-
age to nearby walls and materials.
Plug the power cord into the appropriate
power outlet. Refer to the specification
plate for the proper voltage.
1. Place the unit on a flat, sturdy loca-
tion.
2. Install the Bun Chute.
3. Hang the Butter Wheel Heated Base
on the front of the unit and install the
Butter Pan and Butter Wheel inside.
4. To install the Release Sheet, insert the
loose end of the sheet into the toaster
(Figure 1). Turn the unit on and allow
the Conveyor Belt to draw the sheet
into the unit. Turn the unit off.
IMPORTANT: Do not plug any other power
cords into the receptacles on the toaster.
These outlets are intended for the Butter
Wheel only.
Bread may burn. Therefore toasters must
not be used near or below curtains or other
combustible walls and materials. Failure to
maintain safe operating distances may cause
discoloration or combustion.

OPERATING INSTRUCTIONS

NOTE: The unit includes a Bun Thickness
Adjustment Control that is factory set.
The recommended Bun Thickness setting
is 4 for CROWN (Figure 3) and 3 for HEEL
(Figure 4).
The temperature display flashes "LO" until the
toaster reaches its preset operating tempera-
ture. When the toaster approaches the preset
temperature of 560°F (293°C), "USE" appears
in the temperature display and the unit is
ready to toast buns. If "USE" does not appear
in the window after approximately 30 min-
utes, contact your Authorized Service Agency.
NOTE: Observe the CROWN and HEEL
labels on the front of the unit for proper
toasting. Insert buns cut side DOWN.
5
5. Plug the butter Wheel Assembly power
cord into the receptacle on the front of
the unit.
6. Install the Top Cover and Heat Shield.
CAUTION
1. Turn on the power and allow the unit to
warm up for 30 minutes.
2. Fill the Butter Wheel Pan as directed.
Make sure the Butter Wheel plug is
connected to the outlet on the unit
and that the Butter Wheel light is on.
3. Run the Crowns and Heels cut side
DOWN across the Butter Wheel and
place the bun on the front of the
Butter Pan Ramp (Figure 2).
4. Toasted buns will drop out of the
unit and down the Bun Chute after
approximately 16 seconds.
5. Test at least four buns before putting
the toaster into service.
6. Turn the unit off when finished toast-
ing for the day and proceed with
the Daily Cleaning as outlined in the
Maintenance section of this manual.

Advertisement

Table of Contents
loading

Table of Contents