Step 3 Confirming/Changing the Job Flow Sheet
1
Select a job flow sheet.
2
To see the details, select [Details].
To change the settings, select
[Change Settings].
For information on checking/changing job
flow settings, refer to "Selecting/Changing
a Job Flow Sheet" (P.74).
Step 4 Starting the Job Flow Sheet
1
Load the originals.
Note
• A job flow sheet with application linkage does not require loading documents.
2
Press the <Start> button.
Important • After executing the job flow, print the job history report to check the result. For information on
the job history report, refer to "Print Report/List" of "Billing Meter/Print Report" under
"Chapter 12 Machine Status" in the User Guide.
Job Flow Procedure
8
73