Daikin DCM601A51 Commissioning Manual page 84

Hide thumbs Also See for DCM601A51:
Table of Contents

Advertisement

Scene
Failure mode
Impact to users
During
Emergency Stop
Emergency stop cannot
Leakage
signal has been
stop indoor units
Check
received during
Leakage Check
Time has been
None
modified during
Leakage Check
iTM stops during
None
Leakage Check due
to power outage
iTM and outdoor unit
Leakage Check is
stopped simultaneously
interrupted
during Leakage Check
due to power outage
Error in the
None
communication
between iTM and
outdoor unit during
Leakage Check
Outdoor unit
Leakage Check is
experiences
interrupted
power outage
during Leakage
Check
Attempt to
• The outdoor unit/
release
indoor units
Maintenance
malfunction
status of the
because Automatic
target
Control is not
management
disabled
point from
• Leakage Check
System Settings
instruction can be
during Leakage
sent again
Check
Leakage
Outdoor unit
None
Check
experiences
results
communication
acquisition
error after Leakage
Check end
iTM stops after
None
Leakage Check
end due to
power outage
83
Cause
Indoor units are
under maintenance
The outdoor unit
interrupts Leakage
Check in case of
power outage
The outdoor unit
interrupts Leakage
Check in case of
power outage
Automatic Control are
not disabled
Whether Leakage
Check is been run or
not cannot be checked
Commissioning Manual EM11A021
DCM601A51 intelligent Touch Manager
Handling
Notification method
When
How
At emergency
• The emergency stop
stop signal
signal is sent and indoor
generation
units emergency stopped
Judgment is possible because the results are viewable when
an iTM start time of 180 minutes has elapsed since the start
of Leakage Check even after a change in the scheduled time.
However, modifying the time during Leakage Check should
be avoided from the operation viewpoint
When iTM starts up after power recovery, it judges the end
time from the Leakage Check start time and current time. If
the Leakage Check has not been completed, it is continued
and the results checked after completion
When a
• Leakage Check
communication
failure is recorded
error occurred
in the history
• Maintenance status
is released
When an iTM
• Maintenance status
start time of
is released and the
180 minutes
Leakage Check
has elapsed
results checked
since the
start of
Leakage
Check
When releasing
• Transition to the
the Maintenance
Maintenance
status
screen is prevented
during Leakage
Check
There is no problem since the Leakage Check results are
already received
There is no problem since the Leakage Check results are
already received
Recovery method
Touch the [Check Start]
button or set up the
schedule again after the
Emergency Stop is released
Touch the [Check
Start] button again or
set up the schedule
again after
recovering the cause
of failure
Touch the [Check
Start] button again or
set up the schedule
again after
recovering the cause
of failure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents