Step 15
Visually inspect installation and verify operation. In sum-
mary, your Green POWER OK indicator and Amber
READY indicator status should remain ON. The RUN indi-
cator should be Green. Your I/O module ACTIVE indicators
should be Green.
Your PC installation is now complete and verified. If you have an obvious prob-
lem, take the appropriate corrective action. If your LED status is incorrect, refer to
the Installation Troubleshooting Chart in Appendix B.
GMXB84-EDK
System Installation
67