Verify Your Rio Installation - Black & Decker d984 Installation Manual

Table of Contents

Advertisement

Step 3
Install J89X module next to the power supply module and
secure with captive screws.
Step
4
Repeat Steps (1) thru (3) above for all remaining drops.
Verify Your RIO Installation
E=
Note
Your RIO system is ready for initial power up and check-out af-
ter Remote I/O Cabling is complete (Refer to GM-0984-RIO
The Re-
mote I/O Planning Guide).
Step 1
Step
2
Step
3
Step
4
Step
5
Visually inspect installation including grounds at the Drop.
Energize your RIO power supply and J89X RIOP adaptor at
a selected Drop.
Visually inspect installation and verify operation. Your
Power Supply POWER ON Indicator and your J89X
READY Indicator should both come up Green.
Connect Programming Panel to controller, stop, configure
and I/O map it. Put up a small test program and communi-
cate with the selected Drop to verify cable system installa-
tion to this point.
If necessary, see Appendix 6 for Cable Checkout informa-
tion and/or for Error Codes and other related troubleshoot-
ing information.
Repeat Steps 1 thru 4 above for all remaining drops.
74
System Installation
GM-O984-EDK

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E984K984-x8x controllers

Table of Contents