Mitsubishi Electric AG-150A Instruction Book page 18

Air-conditioner control system centralized controller
Hide thumbs Also See for AG-150A:
Table of Contents

Advertisement

After the network settings have been made, touch [Groups], select the EC
number from the tab menu, and make the group settings for each EC.
* The settings for the units that are connected to a different Expansion
controller cannot be made.
(Refer to Section 7-7 for the details of how to make the settings.)
Make other settings such as block settings and interlocked LOSSNAY
settings. Refer to appropriate sections in Chapter 7 on how to make the
settings.
Configure the floor layout on the [Floor Layout] screen if necessary.
* When the unit is started up again, the [Operation/Monitor], instead of the
Initial Settings screen, will appear. To change certain settings, refer to
Section 7-1 Calling up the initial setting screen to change the settings.
The Date and Time setting screen will appear. Set the date and time. (Refer
to Section 7-3 for the details on how to set the date and time.)
* To synchronize the time with the Expansion controllers, be sure to
manually set the correct date and time.
* Touch the [Save Settings] button to reflect the changes.
When the above settings have been made, the initial settings are complete.
Touch the
on the top right hand of the screen to go into the [Operation/
Monitor] screen.
– 17 –

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ag-150a-a

Table of Contents