(b) Network range assignment
Item
Monitoring time
Start
Station
No.1
End
LB
Start
Station
No.2
LB/LW
End
setting(1)
Start
*1
Station
No.1
End
LW
Start
Station
No.2
End
*1
LX/LY setting
*1
Specify I/O master station
Specify reserved station
Supplementary setting
: Necessary
*1
Be sure to set it to perform the cyclic transmission.
POINT
POINT
POINT
When changing the network parameter
After writing the network parameter to the PLC CPU,
operate the PLC CPU ether turning OFF and then ON
or resetting.
Setting
necessity at
Set value
GOT
connection
2000
0000
H
00FF
H
0100
H
01FF
H
00000
H
000FF
H
00100
H
001FF
H
No setting
No setting
No setting
(Use default value)
: As necessary
: Not necessary
10. CC-Link IE CONTROLLER NETWORK CONNECTION
(c) Routing parameter setting
Up to 64 [Transfer Network No.]s can be set.
However, the same transfer network number
cannot be set twice or more (multiple times).
Therefore, the one that can access to other station
from the request source host GOT is 64 kinds of
[Transfer Network No.]s.
Item
Target network No.
Relay network No.
Relay station No.
POINT
POINT
POINT
Routing parameter setting of request source
Routing parameter setting is also necessary for the
request source GOT.
For the setting, refer to the following.
10.3.3 Routing parameter setting
10.4 PLC Side Setting
Range
1 to 239
1 to 239
1 to 120
10 - 13