Mitsubishi GOT2000 Series Connection Manual page 137

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

2.
Set the trigger action.
Make the setting so that the station number is switched when the faulty station information (GS231) from the station
monitoring specified by selecting [Common]
(For Network No. 1 and Station No. 2, set "258"(0102H))
Condition 1 : GS231.b0 (while ON)
Operation
Condition 1 : GS231.b1 (while ON)
Operation
Create the trigger action in the project on the Project tab.
POINT
POINT
POINT
Setting for the trigger action function
For the trigger action function, hexadecimals cannot be used.
To use the trigger action function, set the N/W No. and the station No. of the PLC CPU in [Unsigned BIN].
(For the trigger action function, set [Unsigned BIN] for [Storing Device])
Example:
When N/W No.: 1 and Station No.: 1 (0101H)
Set "257".
When N/W No.: 10 and Station No.: 10 (0A0AH)
Set "2570".
3.
Create a monitor screen.
For MELSECNET/H connection, MELSECNET/10 connection or Ethernet connection: (Common)
In the device setting (network setting) of each object, set Network No. 1 and Station No. 1 of the control system.
4.10 Switch the Monitor Target to the Control System Using the Script Function
[trigger action] turns ON.
When b0 is ON, Station No. 1 is abnormal.
: GD100=258(0102H)
Station No. is changed to 2.
When b1 is ON, Station No. 2 is abnormal.
: GD100=257(0101H)
Station No. is changed to 1.
4. HOW TO MONITOR REDUNTANT SYSTEM
4
4 - 35

Advertisement

Table of Contents
loading

Table of Contents