System Initialization; Figure 3-17. Cpc Memory Clear Switch - Panasonic CPC-EX Installation Manual

Digital business system section 300 (applies to cpc-aii/b version 9.2 and cpc-ex version 2.3)
Table of Contents

Advertisement

Section 300-Installation

System Initialization

1. Confirm that the DBS power switch is OFF.
2. Plug the power cord into a dedicated 120V 15 amp AC wall outlet.
3. Set SW1 on the CPC card to RAMCLR (RAM Clear).

Figure 3-17. CPC memory clear switch

TRK1 TRK2 TRK3
4. Turn the power switch on.
5. Once the bottom LED lamp on the CPC card stops flashing, set SW1 on
DBS-2.3/9.2-300
Note: A surge protector should be installed on the power cord.
EC1
EC2
EC3
EC4
EC5
EC6
EC7
As the system loads, the bottom LED lamp on the CPC card will flash.
the CPC to RAMHOLD.
DBS Manual - Revised April 2000
EC8 EC/ TRK SCC
CPC AUX1 AUX2
Chapter 3. Cabinet Installation
STATU S
LED
SW 1
RAM H O LD
RAM C LR
3-17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vb-43030Vb-43050Vb-43060Dbs 40Dbs 72Dbs 96

Table of Contents