System Initialization - Panasonic DBS 824 Manual

Hide thumbs Also See for DBS 824:
Table of Contents

Advertisement

Cabinet Installation

System Initialization

1
2
3
Figure 3 8 CPC memnrv clear switch
Power
Power Supply-
4 Turn the power switch on
5
issued 3/l I95
Confirm that the DBS 824 power switch is OFF
Plug the power cord into a dedicated 120V 15 amp AC wall outlet.
Note: A surge protector should be installed on the power cord
Set SW1 on the CPC card to RAM CLEAR
As the system loads, the Status LED lamp on the Cl% card flashes
Once the Status LED lamp on the CPC card stops flashing, set SW1 on
the CPC to HOLD
DBS 824-l O-300
System Initialization
Status
LED
CAUTION:
Some early CPC cards
have RAM HOLD and
RAM CLEAR reversed
Check the silk screen
Programming
0

Advertisement

Table of Contents
loading

Table of Contents