D5-Evo Manual Override; Disengage The Gearbox/Drive - Centsys D5-Evo User Manual

Industrial sliding gate operator
Hide thumbs Also See for D5-Evo:
Table of Contents

Advertisement

3.1. Disengaging the
Manual
gearbox/drive
Override
Carefully flip to the side the
camlock cover and insert the
key and rotate it 90° clockwise.
While holding onto the key, pull
open the access door to expose
the manual override
thumbwheel. This will allow for
the removal of the cover, as well
as for the rotation of the release
thumbwheel.
Rotate the thumbwheel
clockwise until gearbox releases
and gate can be moved
manually.
If the gearbox must be left in
manual mode for an extended
period of time for whatever
reason, it is recommended that
the access door is locked. This
secures the cover and prevents
access to the inside of the unit,
which could contain high
voltages. It also prevents theft
of any components and provides
full protection from the
elements.
3.2. Re-engaging
gearbox/drive
Rotate thumbwheel anti-
clockwise until thumbwheel feels
loose in the hand. Make sure
that the manual override access
door can be closed.
Slide gate until gearbox/drive
engages. Never run the motor
before the unit is engaged.

3. D5-Evo Manual override

Do not remove the
thumbwheel. Removal of
the thumbwheel may result
in water entering the
gearbox and the warranty
will be void
page 6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D10D10 turbo

Table of Contents