Operational Space For An Ns2300 System - HP Integrity NonStop i NS2300 Planning Manual

Table of Contents

Advertisement

Operational Space for an NS2300 System

Ensure:
NS2300 system site layout, uses the equipment dimensions, door swing, and service clearances listed in
"Dimensions and Weights" (page 49)
and takes advantage of existing lighting and electrical outlets.
Airflow direction and current or future air conditioning ducts are not obstructed. Eliminate any obstructions to
equipment intake or exhaust air flow. Refer to
"Cooling and Humidity Control" (page
27).
Adequate space planning to allow for future equipment.
Site layout plan includes provisions for things such as channels or fixtures used for cable routing, cables, patch
panels, and storage areas.
Operational Space for an NS2300 System
29

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Integrity NonStop i NS2300 and is the answer not in the manual?

Questions and answers

Table of Contents