Programmable Inputs, Terminals 6 And 7 - ABB PST30 Installation And Commissioning Manual

Softstarters
Hide thumbs Also See for PST30:
Table of Contents

Advertisement

Chapter 5
Connection
Figure 17: Terminals 6, 7
1
2
3
4
5
6
7
8
9
10
L
N
24 V
100-250V
50/60 Hz
Stop Start
In0
In1
Vc
Vn
Vp
Figure 18: Internal control voltage
1. . . . . . . . . . . . . . . . . . . . . . . . 20
Figure 20: Tightening torques and cable dimensions (1 mm=0.0394 in)
50

5:2.2.4 Programmable inputs, terminals 6 and 7

11 12
13 14
15 16
17 18
19
20
Vp
K4
K5
K6
M3
0,5 Nm - 4,3 lb.in
The softstarter has two programmable inputs.
In0, default reset event.
In1, default reset event.
See Chapter 7 "Settings and configuration" for programming.
1. Connect the cables according to Figure 18 or Figure 19
depending on whether internal or external source is used.
Wiring for sequence start, see next page.
Warning!
Terminal 4, 5, 6, 7, 8, 9, 10, and 11 should be connected
using 24V DC only. Other voltages may damage the
softstarter and the warranty may no longer be valid.
+
DC
-
1
2
3
4
5
6
7
8
9
L
N
24 V
100-250V
50/60 Hz
Stop Start
In0
In1
Vc
Figure 19: External control voltage
3,5x0,6
10
11
12
13 14
15 16
17 18
19
Vn
Vp
Vp
K4
K5
K6
0,14 ... 2,5 mm
AWG 12 ... 22
0,14 ... 2,5 mm
1SFC132003M0201
20
2
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents