Additional Risks And Measures In Handling Tasks; Type Of Tasks To Be Carried Out; Inspection Tasks; Control Tasks - Ingecon Sun 250 M220 Indoor Installation Manual

Table of Contents

Advertisement

Installation manual
Knocks, punctures and cuts from objects and/or tools
Keep the lid closed if not working inside
Adequate lighting
Order and cleanliness
Mandatory use of hard hat, safety footwear and gloves when necessary.
Flying particles (fan)
Recommended use of anti-impact glasses when accessing the fan area.
electrical risk
Follow the instructions in the section on PPe and "4.2. General safety precautions"
Inform the worker of the risk
comply with R.D.614/2001 and REBT.

4.3.2. Additional risks and measures in handling tasks

Thermal contact
Inform workers of the risk
Recommended use of gloves
Disconnect the power and wait 10 minutes for the hot parts inside the unit (R1, RAD1) to cool.

4.4. Type of tasks to be carried out

The preventive maintenance tasks for the electrical panels involve Inspection, control and Handling actions, depending
on the case.
Accessing the housing through any other cubicle other than that described in this manual is strictly prohibited.
To open any of the covers of the enclosure (side, rear, top or door) the main power supply outside of the box must be
switched off.

4.4.1. Inspection tasks

Definition: Involves opening the enclosure for visual inspection tasks.

4.4.2. control tasks

Definition: tasks involving loading software, checking and adjusting heating and ventilation systems. checking voltage
at safe measuring points.
Preventive maintenance tasks of the unit which don't include electrical panels, carried out via man-machine interface.
control tasks related to testing and changing circuit breaker settings, under no circumstances will the any part thereof
(terminals, cables, protections) be accessed or subject to control tasks during this operation, except to the specific
control to verify and/or modify the settings.

4.4.3. Handling tasks

Definition: Tasks involving the assembly and/or replacement of parts as well as changes to the setting of panel compo-
nents. Any task that does not fall under Inspection or control is considered Handling.
It is always necessary to first disconnect and check for absence of voltage.
The "5 golden Rules" must be adhered to.
AAV2000IKI01
Ingeteam
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents